top of page
OPERATIONAL AND MAINTENANCE DASHBOARD
Entrance Page
Unit Selection
Unit 1
File 1 - Project
File 2 - Project Delivery Team
File 3 - Hazardous Materials
File 4 - Mech, Elec, Plumbing & Lifts
File 5 - Architectural and Structural
File 6 - Environmental
File 7 - As Built Drawings
File 8 - Cleaning & Maintence Schedules
File 9 - Testing and Commissioning
File 10 - Training Log and Manuals
File 11 -Section 38 Building Regs Manual
Unit 2
File 1 - Project
File 2 - Project Delivery Team
File 3 - Hazardous Materials
File 4 - Mech, Elec, Plumbing & Lifts
File 5 - Architectural and Structural
File 6 - Environmental
File 7 - As Built Drawings
File 8 - Cleaning & Maintence Schedules
File 9 - Testing and Commissing
File 10 - Training Log and Manuals
File 11 -Section 38 Building Regs Manual
Unit 3
File 1 - Project
File 2 - Project Delivery Team
File 3 - Hazardous Materials
File 4 - Mech, Elec, Plumbing & Lifts
File 5 - Architectural and Structural
File 6 - Environmental
File 7 - As Built Drawings
File 8 - Cleaning & Maintence Schedules
File 9 - Testing and Commissing
File 10 - Training Log and Manuals
File 11 -Section 38 Building Regs Manual
Unit 4
File 1 - Project
File 2 - Project Delivery Team
File 3 - Hazardous Materials
File 4 - Mech, Elec, Plumbing & Lifts
File 5 - Architectural and Structural
File 6 - Environmental
File 7 - As Built Drawings
File 8 - Cleaning & Maintence Schedules
File 9 - Testing and Commissing
File 10 - Training Log and Manual
File 11 -Section 38 Building Regs Manual
File 1 - Project
Unit Three
File 1
1.1 Introduction and Legal Duties
1.2 Index
1.3 Planning Permission and Conditions Charge
1.4 Building Regulations Sign Off
1.5 Principal Designer, Principal Contractor & Professional Team building regulations compliance statements
1.6 CDM and Fire Strategy Sign Offs
1.7 Fire Strategy Document
1.8 Travel Plan
1.9 Practical Completion Certificate
1.10 Practical Completion Handover Checklist
1.11 - Environmental & Building Accreditation Certificates including EPC
1.12 Independent measure of all buildings
1.13 Making Good of Defects Certificate
1.14 Release of Retention Payment Certificate
Subfile 1.11 (Environmental & Building Accreditation Certificates
1.11.1 EPC – SBEM – BRUKL
1.11.2 Air Test
1.11.3 Acoustic Test
1.11.4 CCTV Drainage Footage
1.11.5 Lifting Beam
1.11.6 Lightning Protection
1.11.7 Cleaning & Maintenance Strategy
1.11.8 Building User Guides
1.11.9 Considerate Constructor Scheme
1.11.10 BREEAM
1.11.11 Net Zero Carbon studies, route map, NABERS
1.11.4 CCTV Drainage Report
Back to Top
bottom of page